@capo
Capo/Agents/Task Assignment
Agent · 08 · task assignment · available q3 2026

Real-time conditions.
Shift to-dos.

Based on sales pace, inventory levels, and who's clocked in, the agent generates and dispatches task lists to specific staff. Spots bottlenecks before peak — "rush starts in 30 min, station A is still cutting."

Status
Available Q3 2026
Inputs
POS · timeclock · inventory
Output
Per-person to-dos
Surface
KDS · station screens
Section · 01 · what's coming

A floor manager
that doesn't sleep.

The agent watches sales pace, prep status, and who's on the line — and generates the next 30 minutes of tasks. Targeted, named, and time-boxed.

Glendale · Wed · 11:42 · pre-rush 3 staff on · forecast 14% above avg
→ MARIA
Finish chicken velvet portioning · target 4 lb cooked.
Forecast says rush in 28 min · running 6 min behind.
28 MIN
→ JAMES
Refill bok choy on station B · current 1.2 lb.
Below 1.5 lb threshold for forecast volume.
NOW
→ LINH
Stage rice for next batch · 4 cups uncooked.
Stand at 12:10 · accounts for cook time + rest.
+15 MIN
→ FLAG
Capo: Tony called out · station A short by 1 for dinner.
Suggest moving Linh from prep to line at 4:30 PM · owner approval needed.
Review →
Section · 02 · how it's being built

Built carefully.
Tested at peak.

Routing your team during peak is the highest-stakes thing the agent will do. The labor-optimization model is in development with Ricemill stores — every recommendation validated against real shift outcomes before it reaches your floor.

Get on the
Q3 2026 list.